Home F2N Reclamation
Client: Top 3 Midstream Companies in Canada

JPS Division: Pipeline Services

Project Type: Mainline Support, Reclamation & PCM

Project Location: Fox Creek to Namao in Alberta

Time Frame: January 2018 – October 2021

Contract Type: Gross Maximum, Time & Materials

Scope of Work

R

Mitigate pipeline construction deficiencies

R

Hotline excavation & back-fill

R

R.O.W grading, fencing & de-watering

R

Construct & maintain temporary access

R

Land clearing, processing, skidding

R

Vegetation control & management

R

Environmental reclamation on Spreads 1-4

R

Erosion control, soil containment

R

Monitor clubroot work zones and take appropriate measures to mitigate the spread of clubroot

R

PCM (Post Construction Maintenance) of all deficiencies

Equipment Used on Project

R

200, 270, 300 & 370 Series Excavators

R

D5 & D6 Bulldozers

R

150-250 Hp Wheel Loaders

R

70-110 Hp Skid-steers

R

Morooka MST 2200'S

R

300 Hp Mulchers

R

Personnel Carriers: Argo's, Side by Sides, Quads, Sherps

R

Water Trucks & Hydro Vac Trucks

R

Picker Trucks, Service Trucks, Tractors & Trailers

R

Water pumps, generators, light plants, washrooms, office

Challenges Overcome

R

Worked cohesively with governing bodies such as the AER, AEP and Environment Canada to ensure that all environmental regulations are met throughout the construction and environmental process

R

Successfully completed r.o.w. reclamation in wet conditions without any major deficiencies

R

Complete project with zero safety incidents

R

Completed extensive fencing through wetland areas throughout the winter months in frozen conditions

R

Worked alongside mainline contractors to assess and overcome obstacles as a team

R

Worked independently, providing daily inspection reports directly to the pipeline owner

R

Designed & implemented post construction maintenance program

Safety Stats

Total Recordable Incidents: 0

LTI/Frequency: 0

TRI/Frequency: 0

Manhours: 58,739