Client: Top 3 Midstream Companies in Canada
JPS Division: Pipeline Services
Project Type: Mainline Support, Reclamation & PCM
Project Location: Fox Creek to Namao in Alberta
Time Frame: January 2018 – October 2021
Contract Type: Gross Maximum, Time & Materials
Scope of Work
Mitigate pipeline construction deficiencies
Hotline excavation & back-fill
R.O.W grading, fencing & de-watering
Construct & maintain temporary access
Land clearing, processing, skidding
Vegetation control & management
Environmental reclamation on Spreads 1-4
Erosion control, soil containment
Monitor clubroot work zones and take appropriate measures to mitigate the spread of clubroot
PCM (Post Construction Maintenance) of all deficiencies
Equipment Used on Project
200, 270, 300 & 370 Series Excavators
D5 & D6 Bulldozers
150-250 Hp Wheel Loaders
70-110 Hp Skid-steers
Morooka MST 2200'S
300 Hp Mulchers
Personnel Carriers: Argo's, Side by Sides, Quads, Sherps
Water Trucks & Hydro Vac Trucks
Picker Trucks, Service Trucks, Tractors & Trailers
Water pumps, generators, light plants, washrooms, office
Challenges Overcome
Worked cohesively with governing bodies such as the AER, AEP and Environment Canada to ensure that all environmental regulations are met throughout the construction and environmental process
Successfully completed r.o.w. reclamation in wet conditions without any major deficiencies
Complete project with zero safety incidents
Completed extensive fencing through wetland areas throughout the winter months in frozen conditions
Worked alongside mainline contractors to assess and overcome obstacles as a team
Worked independently, providing daily inspection reports directly to the pipeline owner
Designed & implemented post construction maintenance program
Safety Stats
Total Recordable Incidents: 0
LTI/Frequency: 0
TRI/Frequency: 0
Manhours: 58,739